Dear Sir or Madam, the work on defects in the apartments that have already been accepted continues to progress. As soon as the construction management notifies us of the defects in your residential unit, we will contact you to carry out a declaration of defects together with you on site.

This week the clinker brick work and earthworks on the boundary wall on Augustastrasse will be carried out in construction areas 1 and 2.

BF1
In construction site 1, plastering work on the facade, clinker brick work and the remaining tiling work are being carried out on house 2. In addition, the terrace tiles and glass railings for House 2 are transported over the apartment balconies and prepared for further laying.

BF 2
The terrace slabs of house 4 are laid here. In addition, the laying of the terrace slabs in House 6 is in its final stages. In addition, the oversized slabs of the terraces of houses 5 and 6 will be installed.

BF 3
Specifically, the concreting of the underground car park entrance is being prepared for Villa B1. In addition, drying work will be carried out in villas B1 and B2 and the electronics will be installed. In general, in construction area 3, the eaves are installed, work is carried out on the roof and terrace waterproofing, and earthworks and drainage shaft work is carried out.

We thank you very much for your trust and your patience. We wish you a pleasant and successful week!